Skip to content
vuetech.sh
vuetech.sh
Precisely dressed Cat6A cable bundles terminating into labeled patch panels

Infrastructure

Nothing above it is better than this.

Cabling is the only part of the system with a twenty-year service life, and the only part that is genuinely painful to redo. We install it the way it should be: dressed, labeled, tested to standard, and documented — so troubleshooting is a two-minute look at a port map instead of an afternoon with a toner.

Cat6A
Standard copper spec
OM4/OS2
Fiber backbone
Every run
Certified and reported

01

Copper and fiber to standard

Cat6A to the desk and the access point, single-mode or multimode fiber between rooms, sized against distance and the bandwidth you will need after the next two refreshes. Installed within bend radius, within pull tension, and away from the sources of interference that make intermittent faults so hard to chase.

  • Cat6 and Cat6A horizontal distribution
  • OM4 multimode and OS2 single-mode backbone
  • PoE++ capable runs for cameras, APs, and displays
  • Coax, speaker, and control cabling where needed

02

Dressed, because it matters later

Clean racks are not vanity. Combed and dressed bundles, proper strain relief, and service loops in the right places are what make the next change safe to perform on a live system. Sloppy racks are where outages come from.

  • Combed and dressed bundles with strain relief
  • Horizontal and vertical cable management
  • Service loops sized for future moves
  • Airflow-aware rack layout

03

Labeled to a scheme

Every cable, port, panel, and rack labeled to a documented convention that holds up across the building and across future additions. Both ends. Machine printed. The label still legible in five years.

  • Documented labeling convention applied end to end
  • Machine-printed, abrasion-resistant labels
  • Port maps and patching records
  • Consistent across every site in a multi-location rollout

04

Tested, with the results in writing

Every run certified with a calibrated tester and the results handed over as a report. Fiber gets insertion loss and OTDR traces. If a run does not pass, it gets fixed before we call the job done — not after you find it.

  • Certification testing on 100% of runs
  • Fiber insertion loss and OTDR documentation
  • Written test report at closeout
  • Warranty on workmanship and materials

What you get

Everything handed over, in writing.

A job is not finished when it works. It is finished when someone who has never met us could maintain it from the documentation.

  • Cabling design and pathway drawings
  • Certified installation with 100% test results
  • Documented labeling scheme applied throughout
  • Rack elevations and port maps
  • As-built drawings
  • Workmanship warranty

Keep going

Start here

Walk the building with us.

Bring drawings if you have them, or just the address. We will tell you what the building needs, what it does not, and what it costs — before anyone signs anything.

San Francisco HQ · Deploying nationwide